Skip to content
DOT

DOT Takes Steps to Improve Ped Safety Near Park Avenue Tunnel

Last night, DOT closed both lanes of the Park Avenue Tunnel to prepare for the construction of safety upgrades at Park and 33rd Street. That's the intersection where southbound cars exit the tunnel, creating a dangerous blend of speeding vehicles and poor sight lines. From 1995 to 2005, 156 pedestrians and 10 cyclists were struck by cars there, according to CrashStat.

park_ave_tunnel.jpg
The pedestrian crossing at Park and 33rd before the implementation of new safety measures.

Last night, DOT closed both lanes of the Park Avenue Tunnel to prepare for the construction of safety upgrades at Park and 33rd Street. That’s the intersection where southbound cars exit the tunnel, creating a dangerous blend of speeding vehicles and poor sight lines. From 1995 to 2005, 156 pedestrians and 10 cyclists were struck by cars there, according to CrashStat.

DOT is putting in sidewalk extensions and pedestrian refuges, which it expects to complete by Wednesday. Afterwards, the southbound lane of the tunnel will remain closed. DOT is billing the lane closure as a trial that may become permanent after the agency measures the impact on pedestrian safety and traffic.

“A combination of high speeds, bad sightlines and dense walking traffic
have made this a perennially hazardous crossing,” Transportation Alternatives’ Wiley
Norvell said of the 33rd Street intersection, which sits in the midst of several subway entrances. “166 crashes in a 10 year period is an indication that this
intersection is failing, and we applaud the DOT for taking steps to
reduce the number of pedestrians struck here.”

A pedestrian refuge is also being installed at 40th Street, the other tunnel entrance. More details from DOT about the improvements after the jump. 

Starting August 3rd at 10 p.m., the Park Avenue tunnel will be closed to traffic in both directions and barriers will be installed to direct traffic onto the surface lanes of Park Avenue and 40th Street. Work is expected to be complete on Wednesday, Aug. 6th, when southbound traffic will remain diverted to surface lanes at 40th Street, and a single northbound lane will reopen at 33rd Street.

At Park and 33rd, DOT will construct a nine-foot extension to the sidewalk at the southeast corner and a 10-foot pedestrian island at the south crosswalk, shortening the distance that pedestrians need to cross by 20% — from 94 feet to 75 feet. Pedestrian crossing on the north side of this intersection will remain prohibited.

As part of the project, DOT will build an eight-foot pedestrian island in the south crosswalk at the tunnel entrance at Park and 40th. And below 33rd Street, the southbound lanes will be restriped to account for the removal of the tunnel lane.

Image: Google Street View

Photo of Ben Fried
Ben Fried started as a Streetsblog reporter in 2008 and led the site as editor-in-chief from 2010 to 2018. He lives in Ditmas Park, Brooklyn, with his wife.

Comments Are Temporarily Disabled

Streetsblog is in the process of migrating our commenting system. During this transition, commenting is temporarily unavailable.

Once the migration is complete, you will be able to log back in and will have full access to your comment history. We appreciate your patience and look forward to having you back in the conversation soon.

More from Streetsblog New York City

Opinion: Sean Duffy’s ‘Golden Age’ of Dangerous Streets

Ethan Andersen
December 15, 2025

‘I’m Always on the Bus’: How Transit Advocacy Helped Katie Wilson Become Seattle’s Next Mayor

December 12, 2025

Watchdog Wants Hochul To Nix Bus Lane Enforcement Freebies for MTA Drivers

December 11, 2025

More Truck Routes Are Coming To A Street Near You

December 11, 2025

Upstate County’s New Bus Service Will Turn A Transit Desert Into A Rural Network

December 11, 2025
See all posts